Geotechnical Investigation in Azerbaijan
ZIĞ lake remediation
BAKU TEMIZ SHEHER
• Country: Azerbaijan
• Location: Baku
• Client: İQLİM
• Year: 2018
• Dia: 96mm
• Sampling: (ONShore): 450m
• Sampling: (OFFShore): 40m
• Pressuremeter Tests – 30 no
• Carrying out Cone Penetration Tests‐15 no
UMID-2 PLATFORM AREA
Umid Babek Operating Company (UBOC)
• Country: Azerbaijan
• Location: Baku
• Client: UBOC (Umid Babek Operating Company, SOCAR)
• Year: 2019
• Cone Penetration Tests‐2 no
Wind Power Project (WTG)
Huadong Engineering Corporation Limited
• Country: Azerbaijan
• Location: Khizi-Gobustan
• Client: Huadong Engineering Corporation Limited (HDEC)
• Year: 2023-2024
• Dia: 96mm
• Sampling: 2,665m
• SPT: 1943 no
• Trial Pits: MASW, Thermal, VES
• Toposurvey : 1350 Ha
Solar PV Power Plant and Wind Power Project (WTG)
Geotechnical Investigation
• Country: Azerbaijan
• Location: Bilasuvar (Solar PV)
Neftchala (Solar PV)
Gobustan (WTG)
• Client: JURU Energy
• Year: 2024
• Dia: 96mm
• Sampling: 629.50m
• SPT: 432 no
• Trial Pits: 20 no
• Geophysics: MASW, Crosshole Seismic,VES
• Toposurvey: 1657 Ha
• Plate Load Test: 10 no
Water Reservoir Dam
Geotechnical Investigation
• Country: Azerbaijan
• Location: Shamkir,
Mingachevir,
Yenikand,
Varvara,
Khanabad,
Jeyranbatan
• Client: Shinyei Kaisha
• Year: 2023
• Dia: 96mm
• Sampling: 1,292m
• SPT: 1160 no
• DPH : 15 no
• Geophysics : MASW, Crosshole Seismic, VES
• Toposurvey : 3649.5 Ha
• CPT : 10 no
• Piezo Installation : 71 no
• Water Permeability : 81 no
Shahdag Winter Hotel Complex
Soil Investigation, Inclinometer installation and Monitoring
• Country: Azerbaijan
• Location: Shahdag, Gusar
• Client: Pasha Construction
• Year: 2016
• Dia: 96mm
• Sampling: 80m
• Inclinometer Installation: 5 no
Shaki Khan Mosque
GPR and UAV services
• Country: Azerbaijan
• Location: Shaki
• Client: Heydar Aliyev Foundation
• Year: 2022
• Geophysics : GPR
• Toposurvey : 3649.5 Ha
• Other : LIDAR Scanning
Knightsbridge
Baku White City
• Country: Azerbaijan
• Location: Baku
• Client: Pasha Construction
• Year: 2014-2015
• Dia: 96mm
• Sampling: 3556m
• Destructive: 417m
• SPT: 2120 tests
• Pressuremeter: 240 tests
SCPX
(South Caucasus Pipeline Expansion)
Pipeline Expansion
• Country: Azerbaijan
• Location: Baku-Tbilisi-Ceyhan
• Client: URS
• Year: 2011-2013
• Dia: 229mm
• Sampling: 3403m
•Trial Pit: 314m
• SPT: 1609 tests
City Mall
Baku White City
• Country: Azerbaijan
• Location: Baku
• Client: Pasha Construction
• Year: 2014
• Dia: 96mm
• Sampling: 1800m
• Destructive: 205.20m
• SPT: 443 tests
• CPT: 499m
• Inclinometer Installation: 57 BHs (81 measurements per each BHs)
Boyuk Shore
Baku Temiz Sheher
• Country: Azerbaijan
• Location: Baku
•
Client: SUEZ
• Year: 2016
• Dia: 96mm
• Sampling (ONShore): 579m
• Sampling (OFFShore):
56m
• Piezo Installation: 15 BH